Design and Build Contract for the Extension of the Red Line between São Sebastião and Alcântara

Lisboa, Portugal

Preliminary architectural and structural design of a station, 3 ventilation shafts, 1.6 km of tunnel, geotechnics, traffic diversions, utility conflicts, and 2 special structures (São Sebastião end diaphragm wall and underpass beneath Marquês tunnel).

Preliminary design for design-build tender, developed in consortium with TYPSA, SENER and GRID.

project details

Year

2022-2023

Client name

FCC Construción SA + ACA SA + Convensa SA