New Pier in the Port of Aveiro for Wind Power Tower Industry CSWIND

AVEIRO, Portugal

Pier located in a Logistic and Industrial Activities Zone (ZALI) of the Port of Aveiro. It has a total length of 200m, and is intended for berthing ships of up to 30,000 DWT.

The structural solution consists of a frame structure with an open front, founded on vertical steel piles with reinforced concrete at the connection with the slab. The platform, at an elevation of +5.0 m (ZH), is made up of main beams on which the slabs are supported, thus constituting a reinforced concrete platform, supported by four longitudinal alignments of piles with a diameter of 1.016m and spaced apart in general 7.0 m in the longitudinal direction of the pier.

project details

Services

Concept Studies, Preliminary Study, and Execution Project of Structures, including Technical Assistance.

Year

2018-2021

Client name
Administração do Porto de Aveiro S.A