The DJV formed by EDGAR CARDOSO & ENGIMIND has developed the Detailed Design of 35km road enlargement to 2×2 lanes including the remodeling of 7 junctions. The scope includes Cartography and Topography, Geotechnical Survey, Geological/Geotechnical Study, Traffic Studies and the Design of Alignment, Earthworks, Drainage, Hydrology and Hydraulics, Pavement, Environmental Studies, Bridges and retainment Structures, Telematics, Lighting, Expropriations, Signaling, Safety and HS. Construction has begun in 2024.