371.5 m2

Area

65.0 m2

Dinning Room

100.0 m2

Bedroom

56.5 m2

Kitchen

150.0 m2

Garden

Design and Build Contract for Structural Works under the Lisbon Metro Expansion Plan – Extension of the Yellow and Green Lines (Rato–Cais do Sodré) – Preliminary Design of Tunnels and Stations

Lisboa, Portugal

Preliminary design for the tender of – Lot 1: Construction of a tunnel between PK 0+000 and PK 1+313.429, from the end of Rato Station to the north diaphragm wall of Santos Station; – Lot 2: Construction of a tunnel between PK 1+313.429 and PK 1+985.292, from Santos Station to the end of Cais do Sodré Station. Developed in consortium with INTECSA-INARS

project details

year

2019-2020

client name

FCC Construción SA / Metropolitano de Lisboa