371.5 m2

Area

65.0 m2

Dinning Room

100.0 m2

Bedroom

56.5 m2

Kitchen

150.0 m2

Garden

Nacala Port Development– Phase I and II

Mozambique

The DJV, formed by ORIENTAL CONSULTANTS, EDGAR CARDOSO, PROMAN and ECOH, has developed the detail design and construction supervision of the project. Works included a new access road overpassing the Railway; Dredging works, earthworks and excavations; environmental works; container terminal area and rtg maintenance area; total reconstruction and extension of the north wharf; widening of the existing access road to the port; access gate to the container terminal; railway terminal; buildings; infrastructures and complementary works.

project details

Services

Design, Preliminary Study, and Execution Project of Structures, including Technical Assistance during Construction.

year

2014 – 2023

client name

UIPRPN – Ministério dos Transportes e Comunicações – República de Moçambique